[1] Song XL*, Wang Y, Zhang Z, Shen C, Peña-Mora F. Economic-environmental equilibrium-based bi-level dispatch strategy towards integrated electricity and natural gas systems [J]. Applied Energy, 2020.11. (中科院SCI一区TOP期刊)
[2] Song XL*, Xu J, Shen C, Peña-Mora F. Modelling the effect of multi-stakeholder interactions on construction site layout planning using agent-based decentralized optimization [J]. Automation in Construction, 2019.10. (中科院SCI一区TOP期刊)
[3] Song XL*, Xu J, Shen C, Peña-Mora F. Conflict resolution-motivated strategy towards integrated construction site layout and material logistics planning: A bi-stakeholder perspective [J]. Automation in Construction, 2018, 87: 138-157.(中科院SCI一区TOP期刊)
[4] Song XL*, Zhong L, Zhang Z, et al. Multi-stakeholder conflict minimization–based layout planning of construction temporary facilities [J]. Journal of Computing in Civil Engineering, 2018, 32 (2): 04017080.
[5] Song XL, Xu J*, Zhang Z, et al. Reconciling strategy towards construction site selection-layout for coal-fired power plants [J]. Applied Energy, 2017, 204, 846-865.(中科院SCI一区TOP期刊)
[6] Song XL*, Zhang Z, Xu J, et al. Bi-stakeholder conflict resolution-based layout of construction temporary facilities in large-scale construction projects [J]. International Journal of Civil Engineering, 2017, (3): 1-24.
[7] Song XL, Xu J*, Shen C, et al. A decision-making system for construction temporary facilities layout planning in large-scale construction projects [J]. International Journal of Civil Engineering, 2017, 15 (2): 333-353.
[8] Song XL, Xu J*, Shen C, et al. Conflicts resolution-based construction temporary facilities layout planning in large-scale construction projects [J]. Canadian Journal of Civil Engineering, 2016, 43 (9): 783-801.
[9] Xu J*, Song XL, Wu Y, et al. GIS-modelling based coal-fired power plant site identification and selection [J]. Applied Energy, 2015, 159: 520-539. (中科院SCI一区TOP期刊)
[10] Xu J*, Song XL. Multi-objective dynamic layout problem for temporary construction facilities with unequal-area departments under fuzzy random environment [J]. Knowledge-Based Systems, 2015, 81 (C): 30-45.
[11] Xu J*, Song XL. Suggestions for temporary construction facilities’ layout problems in large-scale construction projects [J]. Journal of Construction Engineering & Management, 2014, 140 (5): 06014001.